{"id":2116,"date":"2025-01-21T16:08:00","date_gmt":"2025-01-21T16:08:00","guid":{"rendered":"https:\/\/www.mtsu.edu\/blogtest\/spring-2025-campus-expansion\/"},"modified":"2026-04-14T16:21:26","modified_gmt":"2026-04-14T21:21:26","slug":"spring-2025-campus-expansion","status":"publish","type":"post","link":"https:\/\/www.mtsu.edu\/president\/spring-2025-campus-expansion\/","title":{"rendered":"Spring 2025 Campus Expansion"},"content":{"rendered":"
<\/div>
\n
\n
\n

Facilities growth represents an investment in areas of study that will solve problems, improve the social good, and supply a skilled regional workforce. MTSU has been blessed with more than $1.5 billion in campus improvements and renovations during my tenure as president.<\/p>\n<\/div>\n<\/div>\n

\n
\n

Here are updates on our current major projects:<\/p>\n

\n
\n
\n

Applied Engineering Building (opens in 2025)<\/p>\n

    \n
  • \n

    $74.8 million project<\/p>\n<\/li>\n

  • \n

    more than $1 million in automation equipment<\/p>\n<\/li>\n

  • \n

    89,000-square-foot facility<\/p>\n<\/li>\n

  • \n

    will house MTSU\u2019s renowned Mechatronics Engineering program and Engineering Technology<\/p>\n<\/li>\n

  • \n

    will provide enhanced student opportunities for faculty-led research and labs for student teams, including the Experimental Vehicles Program and robotics competitions<\/p>\n<\/li>\n

  • \n

    represents the finishing touch to MTSU\u2019s Science Corridor of Innovation, which also includes the $40.1 million Concrete and Construction management building, two renovated science buildings, and the 250,000-square-foot Science Building, which opened in 2014 as the single largest investment by the state for an academic facility<\/p>\n<\/li>\n<\/ul>\n

    \n
    \n
    \n

    Kirksey Old Main and Rutledge Hall (completion expected by summer 2026)<\/p>\n

    \n
    \n
    \n
      \n
    • \n

      $54.3 million renovation to two of MTSU\u2019s original buildings<\/p>\n<\/li>\n

    • \n

      iconic columns of KOM, the first building on campus founded in 1911, will be preserved<\/p>\n<\/li>\n

    • \n

      KOM to remain home to Mathematical Sciences, Computer Science, and Data Science<\/p>\n<\/li>\n

    • \n

      Rutledge being transformed from a dormitory to an academic building that houses the University Studies Department<\/p>\n<\/li>\n<\/ul>\n

      \n
      \n
      \n
      \n

      Student-Athlete Performance Center<\/p>\n

      \n
      \n
      \n
      \n
        \n
      • \n

        $66 million project<\/p>\n<\/li>\n

      • \n

        first stage of redevelopment of the entire northwest corner of the MTSU campus envisioned in the MTSU Athletics Master Plan<\/p>\n<\/li>\n

      • \n

        small section of outdoor loge seating to be added to the north end of Floyd Stadium<\/p>\n<\/li>\n

      • \n

        75,000-square-foot facility to include training spaces, strength and conditioning rooms, locker rooms, meeting space, and offices to serve MTSU Athletics and student-athletes<\/p>\n<\/li>\n<\/ul>\n

        \n
        \n
        \n
        \n

        Aerospace Project\u2013Shelbyville (estimated completion by fall 2027)<\/p>\n

          \n
        • \n

          $62.2 million total project cost<\/p>\n<\/li>\n

        • \n

          estimated $50.2 million construction cost<\/p>\n<\/li>\n

        • \n

          site located along Highway 231 and just west of the Shelbyville Municipal Airport<\/p>\n<\/li>\n

        • \n
          \n
          \n
          \n
          \n

          includes facilities for the Professional Pilot concentration: 50,000-square-foot net space for main academic building(s), including classroom, dispatch, faculty and staff offices, flight briefing; 28,000-square-foot hangar to maintain Professional Pilot aircraft fleet; site and utility improvements for 16-acre parcel<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n

          \u00a0<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"

          Facilities growth represents an investment in areas of study that will solve problems, improve the social good, and supply a skilled regional workforce. MTSU has been blessed with more than $1.5 billion in campus improvements and renovations during my tenure as president.<\/p>\n","protected":false},"author":8,"featured_media":589,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/2116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/comments?post=2116"}],"version-history":[{"count":0,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/2116\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/media\/589"}],"wp:attachment":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/media?parent=2116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/categories?post=2116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/tags?post=2116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}